Now on to the house...
Sorry for the delay in the update but not much has been happening. Its been snowing, and raining, and cold, and basically slow going. Here are some update photos:
I told you it snowed. We got maybe 4 inches that stuck around for a couple of days. Lu loved it of course.
I talked to the rental company that could provide a saw for cutting the windows and determined, through their hesitancy to provide the saw for this application, that having a professional do it would likely save me money (and lots of backache) in the long run. They used a combination of circular saw and chainsaw and did a very nice job. This is the window to the media/tv room. Before...
And After...
And from the inside...
Along the South side of the house, working on egress window #1

Egress window #2, south side
Removing the chunk from egress window #1. Each of these window blocks weighed in excess of 1200 lbs. Now they are in the backyard, just waiting for the boys to mess up. I will have my very own chain gang.
Window #2, with the well dug out and shaped
Just have to put in the drainage gravel and build the well walls; we're thinking landscaping block.
View from inside the guest room (window #2)
View from inside Tav's room (Window 1)
Here is the front, before the sawcutting.
Front of the house, during the cutting...
Front of the house; during, from the inside
And, after.
Tavyrn has been having a hard time washing his feet. I think this will help facilitate healthy habits.
Almost all the interior walls are framed up. I have a couple of miscellaneous walls yet to put up, but its around 85% or so. Exterior walls are a different story...
Three pocket doors populate the bathroom. That's the shower basin (gray) leaning against the back wall. I need to redo the upstairs plumbing before I can put the basin down, but need to sawcut the floor and plumb for the shower prior to that. There's always something.

Thats it for this go-round. All new windows are in (or will be as of tonight). Should make an impact on the exterior walls and plumbing for the shower throughout the week and weekend. The family is coming up this Friday which is always a treat but not usually that productive.
I have training next Tuesday, Wednesday, and Thursday. An exam in two weeks in Eugene. I leave for Azerbaijan for four weeks starting March 26 and may have to return in May. So, I have about 5 weeks to finish before the family moves up. Anyone interested in seeing Washington...through a basement window?





















.jpg)
.jpg)
.jpg)